| Mar 28, 2012 |
The Indicative Schedule for Forward Capacity Auction for Capacity Committment Period 2015-16 (FCA 6). Scheduled to begin on Monday, April 2, 2012. |
 |
PDF (44.4k) |
| Feb 23, 2012 |
|
 |
PDF (187k) |
| Jan 18, 2012 |
The Adjustment to CONE for FCA 6 using the Handy-Whitman Index |
 |
PDF (189k) |
| Jan 18, 2012 |
The Adjustment to the Qualification Thresholds for FCA 6 using the Handy-Whitman Index |
 |
PDF (183k) |
| Jul 08, 2011 |
Pricing thresholds to be used for the Foward Capacity Auction (FCA) |
 |
PDF (148k) |
| Feb 22, 2011 |
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2014. |
 |
DOC (79.5k) |
| Nov 08, 2010 |
The calculation of CONE for FCA 5 based on the Handy-Whitman Index of Public Utility Construction Costs |
 |
PDF (315k) |
| Oct 25, 2010 |
List of FCA 2013-2014 Auction Cleared Delist Bids |
 |
XLSX (385k) |
| Jul 13, 2010 |
|
 |
XLS (173k) |
| Apr 09, 2010 |
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2013. |
 |
PDF (38.0k) |
| Jan 26, 2010 |
The document shows the updated CELT Primary Fuel Type for those resources associated with FCM Maintenance Allotments. |
 |
XLS (77k) |
| Dec 09, 2009 |
List of FCA 2012-2013 Auction Cleared Delist Bids |
 |
XLS (76.5k) |
| Nov 25, 2009 |
ISO-NE Memorandum stating the FCM maintenance allotment values for the first two Capacity Commitment Periods (FCA_2010_2011 and FCA_2011_2012) |
 |
PDF (60.4k) |
| Oct 02, 2009 |
ISO-NE Memorandum stating the FCM maintenance allotment values for the June 1, 2012 through May 31, 2013 Capacity Commitment Period (FCA_2012_2013). |
 |
PDF (86.8k) |
| Aug 14, 2009 |
The draft agreement was created for the sole purpose of assisting NEPOOL existing and future Participants in creating bilateral Composite Offers for the Forward Capacity Market (FCA). |
 |
DOC (158k) |
| Aug 14, 2009 |
The document is a model agreement created for the sole purpose of assisting NEPOOL existing and future Participants in creating bilateral arrangements in the Forward Capacity Market (FCA). |
 |
DOC (133k) |
| Jun 02, 2009 |
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2012. |
 |
PDF (48.6k) |
| May 04, 2009 |
The qualified MW vaules contained in the FERC Informational Filing for Capacity Committment Period 2010-2011 plus additional fields (location and resource sub-type). |
 |
XLS (663k) |
| May 04, 2009 |
The qualified MW vaules contained in the FERC Informational Filing for Capacity Committment Period 2011-2012 plus additional fields (location and resource sub-type). |
 |
XLS (213k) |
| Sep 16, 2008 |
Excel version of Attachment tables included with the FCA-2 FERC Informational Filing made on September 9, 2008 |
 |
XLS (168k) |
| Jul 28, 2008 |
Forward Capacity Market Asset to Exemption Hour Group Mapping Documentation |
 |
PDF (298k) |
| Jul 21, 2008 |
The values used in calculating a load serving entity's projected share of the Installed Capacity Requirement per Capacity Zone for the Capacity Commitment Period beginning June 2011 |
 |
PDF (39.3k) |
| Apr 17, 2008 |
Results including expanded data (Locational information and Demand Resource Type) from the FERC filing. |
 |
XLS (752k) |
| Apr 07, 2008 |
FCA 2010 2011 Results FERC Filing (List of Submitted De-List Bids) |
 |
XLS (75k) |
| Mar 11, 2008 |
FCA 2010 2011 Results FERC Filing (Monthly MW Obligation by Capacity Resource from June 1, 2010 through May 31, 2011) |
 |
XLS (512k) |
| Feb 14, 2008 |
Cost of New Entry (CONE) and Reserve Margin used for the Forward Capacity Auction for the Capacity Commitment Period of June 1, 2011 to May 31, 2012 (FCA_2011_2012) |
 |
PDF (41.9k) |
| Nov 28, 2006 |
Draft version |
 |
PDF (139k) |